技術的記事

A guide to restarting laundry equipment

There is a post-season to everything. The Covid-19 crisis and its constraints on people and businesses have left a severe impact on the world. Even these uniquely challenging months will pass, and they will inevitably be followed by better and brighter times. We look forward to going back to our “new” normal life – and the sooner, the better.

 

After a prolonged shutdown, your JENSEN equipment can be restarted without any major difficulties. Once your laundry is ready to start back up, it is ideal to follow these simple procedures.

 


Before anything else…
Uncover machines that have been protected by plastic. Clean all metal surfaces protected by anti-corrosion and remove all dust. We also recommend closing all air reservoirs. 


Futurail 

The first step is to turn on the Futurail database server PC. This will allow for the database and software system to reboot and connect. 

Next, switch on the 3-phase incoming power to all Futurail control panels. After power is flowing, check and reset all emergency stops that were activated. These emergency stops could be located at MLA’s, belts, and control panels. If required, switch on any additional Futurail operator computer stations (additional PC’s or HMI’s) and any display screens that are located at sorting stations or discharge positions. 


Washroom section

Before turning on power and other utilities, we recommend performing proper maintenance on all equipment in the washroom section. More information can be found in the manual. 

Tunnel Washer

  • Check air and steam supply for condensate and drain if necessary
  • Fill tanks and double drum sections with water, then steam up 
  • Run tunnel with program 0 – empty pockets for ten minutes and verify level switches/sensors, water flow etc. 

 
Water extraction press

  • Check press cushion for damage and proper diameter 
  • If damaged, replace - for correct diameter see manual 
  • Check oil reservoir and hydraulic oil for contamination  
  • Operate press in manual function - lift ram – basket - run belt motor 
  • Run empty cycles via manual operation 

 
Shuttle/Conveyors (via compound control)

  • Turn on power to compound control - make sure all external disconnects are turned on 
  • Operate equipment in manual operation 
  • Check belts for proper tracking - shuttle stop proximity switches for proper function 
  • Check photocells for functionality 

Dryers (part of compound)

  • Operate dryers in manual operation 
  • Run a short dry cycle with an “empty program” – five minutes min/max dry time: Inlet 150° C (300° F) / outlet 65° C (150 F)
    • Note: P values 4 for inlet - 2 for outlet   

Finishing section

When time has come to switch on the gas, air and electrical supply, you may consider asking a local gas specialist for support, especially to re-adjust the burner. 

Feeders

  • Bring all moveable conveyors, feed-stations etc. back to normal position.

Ironers

  • Make sure all previous opened condensate connections are closed.
  • When electrical and air supply is on, the transport brackets or safety-bolts that secure the rolls can be removed.
  • Chests and gap-pieces protected by liquid wax should be heated slowly and the wax cleaned off with rags. After cleaning, the machine needs to be waxed as normal before production. Ironers that only were waxed as protection are to be heated, cleaned as normal with cleaning mats and rags. After this, it should be waxed as normal before production.

Folder and stackers

  • Any pneumatic moveable parts lowered are brought back to normal position.

Garment folders

  • Any pneumatic moveable parts lowered are brought back to normal position.

Garment finishers

  • Make sure all previous opened condensate connections are closed.


Garment section 

Make sure that the system is correctly isolated from electrical power and compressed air before performing maintenance.

  • Clean all slick rails and glide areas by wiping away any dust or dirt particles with a dry cloth in accordance with the Maintenance Manual.
  • Use a paper towel or similar material to wipe up any oil that may have dropped from the chains.
  • All the chains should be inspected. Should you find that they are dry or showing signs of rust, then lubricate them with the recommended oil, Fuchs S.K.D 16N. Special attention should be paid to the Metristore lines which may require slight lubrication.
  • Turn on the air pressure.
  • Check the system for any air leaks. Leaks can be audibly detected.
  • Use a dry cloth to wipe clean all photocells and scanner lenses.
  • Turn on the power switches at the PC-pulpit to power up all PC´s.
  • Turn on the power switch at the main cabinet. This supplies power to motors, I/O modules, scanners etc.
  • The production mode of the MCPC starts automatically. If not, then click “Production” to start the Metricon software, wait until the program is running.
  • Start terminals (from MCPC): 
    • Press Network → Start Terminals.
  • When all terminals have started, the result can be viewed in the bottom of the screen on the MFS (Connected or Waiting for connection).
  • Start all conveyors and chains by following the below three steps on the main cabinet:
    • Clear emergency alarm (Blue light button)
    • Press start button (Green light button)
    • Press reset button (Blue button)

Laundries need to restart operation with care and caution to reduce risk of damages or malfunctions. Following these guidelines will ensure a smooth, safe and simple restart. 

We wish you all the best for the next weeks and months to come, and please remember that we are here to help: Please contact your local JENSEN Service Team should you require any assistance. 
 

最近の記事

10月 2025
Espresso Insights:Laurent Maillard(JENSEN UK Ltd.ゼネラルマネージャー)とのコーヒーでの三つの質問

Laurent Maillardは、イギリス・バンベリーに拠点を置くJENSEN UKのゼネラルマネージャーです。イギリスは紅茶文化で有名ですが、今回は一緒にエスプレッソを楽しみました。

続きを読む

9月 2025
Espresso Insights:JENSEN Asia Pte Ltd. 地域営業マネージャーKeith Tan Chee Mengとのコーヒー片手の3問

Keithは業界知識が豊富で、顧客の成功への情熱を持っています。シンガポールを拠点に、シンガポール、ベトナム、インドネシア、タイの一部、韓国、フィリピンを担当しています。未来の計画、オートメーションの現実、そして顧客のビジネスと共に成長した印象的なプロジェクトについて語っています。

続きを読む

8月 2025
明りは消えてもシステムはオン:ダークファクトリーが洗濯工場の自動化を革新する

産業用洗濯工場は現在、多くの課題に直面しています。特に夜勤スタッフの慢性的な人手不足、賃金コストの上昇、生産や運用効率の向上への圧力が増大が問題になっています。汚れた衣類の手作業による取り扱いは身体的負担が大きく時間もかかり、人員確保も困難で非効率かつ生産能力を制限します。

当社の革新的なダークファクトリーソリューションは、夜間の洗濯工…

続きを読む

8月 2025
エスプレッソ・インサイト: マッズ・アンドレセン氏(チーフ・イノベーション・オフィサー)とのコーヒーブレイク:3つの質問

「エスプレッソ・インサイト」の第一回目として、マッズ・アンドレセン氏と短いコーヒータイムを過ごし、業務用ランドリーのデジタル変革について話を伺いました。自動化からESGまで、彼の語った内容をご紹介します。

続きを読む

4月 2025
温室効果ガスの排出を削減する – 協力による成果

電気や水の節約による経費削減と効率向上は、数十年前から業界の優先事項です。しかし、気候変動の影響を抑えるためにもっと対策を取るべきだという政府、企業、社会からの圧力はますます強まっています。新しい欧州気候法、そして持続可能なソリューションに対する世界中の消費者の期待により、企業は各自のカーボンフットプリントと気候変動に関する明確な目標の設…

続きを読む