There is a post-season to everything. The Covid-19 crisis and its constraints on people and businesses have left a severe impact on the world. Even these uniquely challenging months will pass, and they will inevitably be followed by better and brighter times. We look forward to going back to our “new” normal life – and the sooner, the better.

 

After a prolonged shutdown, your JENSEN equipment can be restarted without any major difficulties. Once your laundry is ready to start back up, it is ideal to follow these simple procedures.

 


Before anything else…
Uncover machines that have been protected by plastic. Clean all metal surfaces protected by anti-corrosion and remove all dust. We also recommend closing all air reservoirs. 


Futurail 

The first step is to turn on the Futurail database server PC. This will allow for the database and software system to reboot and connect. 

Next, switch on the 3-phase incoming power to all Futurail control panels. After power is flowing, check and reset all emergency stops that were activated. These emergency stops could be located at MLA’s, belts, and control panels. If required, switch on any additional Futurail operator computer stations (additional PC’s or HMI’s) and any display screens that are located at sorting stations or discharge positions. 


Washroom section

Before turning on power and other utilities, we recommend performing proper maintenance on all equipment in the washroom section. More information can be found in the manual. 

Tunnel Washer

  • Check air and steam supply for condensate and drain if necessary
  • Fill tanks and double drum sections with water, then steam up 
  • Run tunnel with program 0 – empty pockets for ten minutes and verify level switches/sensors, water flow etc. 

 
Water extraction press

  • Check press cushion for damage and proper diameter 
  • If damaged, replace - for correct diameter see manual 
  • Check oil reservoir and hydraulic oil for contamination  
  • Operate press in manual function - lift ram – basket - run belt motor 
  • Run empty cycles via manual operation 

 
Shuttle/Conveyors (via compound control)

  • Turn on power to compound control - make sure all external disconnects are turned on 
  • Operate equipment in manual operation 
  • Check belts for proper tracking - shuttle stop proximity switches for proper function 
  • Check photocells for functionality 

Dryers (part of compound)

  • Operate dryers in manual operation 
  • Run a short dry cycle with an “empty program” – five minutes min/max dry time: Inlet 150° C (300° F) / outlet 65° C (150 F)
    • Note: P values 4 for inlet - 2 for outlet   

Finishing section

When time has come to switch on the gas, air and electrical supply, you may consider asking a local gas specialist for support, especially to re-adjust the burner. 

Feeders

  • Bring all moveable conveyors, feed-stations etc. back to normal position.

Ironers

  • Make sure all previous opened condensate connections are closed.
  • When electrical and air supply is on, the transport brackets or safety-bolts that secure the rolls can be removed.
  • Chests and gap-pieces protected by liquid wax should be heated slowly and the wax cleaned off with rags. After cleaning, the machine needs to be waxed as normal before production. Ironers that only were waxed as protection are to be heated, cleaned as normal with cleaning mats and rags. After this, it should be waxed as normal before production.

Folder and stackers

  • Any pneumatic moveable parts lowered are brought back to normal position.

Garment folders

  • Any pneumatic moveable parts lowered are brought back to normal position.

Garment finishers

  • Make sure all previous opened condensate connections are closed.


Garment section 

Make sure that the system is correctly isolated from electrical power and compressed air before performing maintenance.

  • Clean all slick rails and glide areas by wiping away any dust or dirt particles with a dry cloth in accordance with the Maintenance Manual.
  • Use a paper towel or similar material to wipe up any oil that may have dropped from the chains.
  • All the chains should be inspected. Should you find that they are dry or showing signs of rust, then lubricate them with the recommended oil, Fuchs S.K.D 16N. Special attention should be paid to the Metristore lines which may require slight lubrication.
  • Turn on the air pressure.
  • Check the system for any air leaks. Leaks can be audibly detected.
  • Use a dry cloth to wipe clean all photocells and scanner lenses.
  • Turn on the power switches at the PC-pulpit to power up all PC´s.
  • Turn on the power switch at the main cabinet. This supplies power to motors, I/O modules, scanners etc.
  • The production mode of the MCPC starts automatically. If not, then click “Production” to start the Metricon software, wait until the program is running.
  • Start terminals (from MCPC): 
    • Press Network → Start Terminals.
  • When all terminals have started, the result can be viewed in the bottom of the screen on the MFS (Connected or Waiting for connection).
  • Start all conveyors and chains by following the below three steps on the main cabinet:
    • Clear emergency alarm (Blue light button)
    • Press start button (Green light button)
    • Press reset button (Blue button)

Laundries need to restart operation with care and caution to reduce risk of damages or malfunctions. Following these guidelines will ensure a smooth, safe and simple restart. 

We wish you all the best for the next weeks and months to come, and please remember that we are here to help: Please contact your local JENSEN Service Team should you require any assistance. 
 

最新文章

十月 2025
精选专访:与 JENSEN 英国有限公司总经理Laurent Maillard共饮咖啡,探讨三个核心问题

Laurent Maillard是位于班伯里的JENSEN英国公司的总经理。尽管英国素来以茶文化闻名,但我们仍一起享用了一杯意式浓缩咖啡。

阅读更多

九月 2025
Espresso Insights精选专访:与JENSEN Asia Pte Ltd地区销售经理Keith Tan Chee Meng的咖啡时光三问

Keith拥有深厚的行业知识,并始终以助力客户成功为己任。他常驻新加坡,负责新加坡、越南、印度尼西亚、泰国部分地区、韩国和菲律宾市场的业务。在访谈中,他分享了关于未来规划的思考、自动化技术的实际应用现状,以及一个与客户业务同步成长的里程碑式项目。

阅读更多

八月 2025
灯光熄灭,系统启动:暗工厂正在革新洗涤自动化

工业洗衣厂目前面临诸多挑战:持续的人才短缺,尤其是夜班员工缺乏;工资成本上升;以及提高产能和运营效率的压力。手工处理脏布草既费力又耗时,而且很难配备人员,导致效率低下和产能受限。

我们的创新“暗工厂”方案彻底改变了洗涤厂的夜间作业,实现了洗涤分类与存储的全自动化,从而实现无人值守的生产。

阅读更多

八月 2025
Espresso Insights: 精选专访 与首席创新官马兹·安德烈森共品咖啡,三问数字化

在 Espresso Insights 的首期专访中,我们与首席创新官马兹·安德烈森共同探讨了工业洗涤行业的数字化转型。从自动化到 ESG,他有如下见解:

阅读更多

四月 2025
减少温室气体排放——携手共创可持续未来

长期以来,节能降耗作为提升运营效率、控制成本的核心举措,始终是行业发展的共识。然而,来自政府、企业及社会各界的压力与日俱增,要求采取更有力的行动应对气候变化带来的挑战。随着欧盟新气候法案的出台以及全球客户对可持续解决方案的期待提升,企业亟需精准测算碳足迹,并设定明确的气候目标。洗涤行业同样肩负着系统性降低环境影响的时代使命。

阅读更多